CALLISTO | CIRCUIT MAKATI
CONDOMINIUM
₱6.7 m - ₱48.9 m
Estimated Price as of 12/31/2019
​
HLURB LS No. 032431, 033386
Ad Approval No.: HLURB ENCR AA-2019/02-2280
Alveo Land adds a spring to your step with its second residential development in Circuit Makati -- Callisto. Located in front of Circuit Lane, this community presents compact living spaces in sync with your every move.
CALLISTO
LOCATION & VICINITY
Image Subtitle
A union of the city's past and future. Jumping off the colorful heritage of the former Sta. Ana Racetrack, Circuit Makati spurs an interactive and energized live-work-play scene, driving kinetic lifestyles ahead in the country's seat of corporate dynamism. Here, it is always a green light.
West Gala Drive corner Theater Drive, Circuit Makati, Makati City
FEATURES & AMENITIES
BUILDING FEATURES
24-hour security services and maintenance
Amenities located at the podium level
Mail room
100% back-up automatic generator system for common areas
CCTV cameras
Fire alarm and smoke detection system
Interior designed main lobby and selected common areas
Two (2) fire exits per residential floor
Centralized sanitary disposal system
Proximity card access at elevators
Automatic fire sprinkler system
Allocated emergency load for residential units in case of power outage
Water reservoir with separate fire reserves
Davit system for building maintenance
INDOOR AMENITIES
Function Room
Game Room
Board Room
Indoor Gym
Library
OUTDOOR AMENITIES
Children's Pool
Children's Play Area
Lap Pool
Outdoor Lounge
Pool Deck
Lawn Area
Lounge Pool
Spill-over Area
SUSTAINABLE FEATURES
LED lighting in common areas
Maximized natural lighting
Low-flow valves
Dual-flush toilets
Building notches that promote natural ventilation in residential corridors
Maximized natural ventilation
PLAN
CONSTRUCTION UPDATES
As of March 2020
DISCOVER NEW EXPRESSIONS OF LIVING WITH CONTEMPORARY SPACES CELEBRATING EVERY UNIQUE LIFESTYLE AT CALLISTO IN CIRCUIT MAKATI – THE ULTIMATE STARTING POINT FOR AN ENERGIZED INVESTMENT.
AS OF MARCH 2020, THE FOLLOWING WORKS
AND MILESTONES WERE ACHIEVED:
TOWER 1:
-Steel Reinforcement and Formworks Installation at 6th & 7th Floors
-Masonry Works at Ground Floor
TOWER 2:
-Formworks Installation at 13th Floor
-Concreting Works at 12th Floor
INQUIRE NOW!!!
We would like to hear from you!